Space Systems
Atec fabricates, assembles and tests Rocket Propulsion Components and Spaceflight Vehicle Hardware. Atec provides components to the major U.S. rocket launch providers. Producing both mechanical and electrical assemblies, Atec has the necessary expertise to provide mission critical flight components. Atec’s on-site machine shops, inspection, assembly, clean rooms and test facilities enable turnkey capabilities.
Proud to provide hardware for the Artemis, ISS, and Military / Commercial Spaceflight Programs
- Battery Adapter Plates for ISS
- Crew Capsule Door Assemblies
- ISS Observation Window Shutter Actuators
Launches with Atec Equipment
Launches with Atec Valves
Mission Support
SLS
Delta IV
Atlas V
Delta II
Vulcan
Space Vehicle Components
Selected Flight & Vehicle Efforts
- Vulcan / Atlas / Delta RL10 engine valves
- RS-25 Engine Valves
- AR1 Valves & Turbomachinery Component
- ISS Battery Adapter Plates
- ISS Solar Array Mounting Systems
- ISS Various Payloads
- RL50/60, 25 RlV, J2X, & 2GRLV development efforts
- Space Shuttle frangible nuts & other parts
- SLS Core Stage Vehicle Components – Doors, Cameras, etc.
- SLS Core Stage Wire Harnesses
- SLS EUS Wire Harnesses
Historic Flight & Vehicle Efforts
- Airborne Laser (various parts)
- G2/G3 electrical interfaces
- Astronaut onboard tools
- LCROSS Moon Lunar Impact RL10 launch vehicle valves
- Curiosity Rover launch vehicle valves
- RD - 180 Engine Operators “Go” Tester
- RL10 & RL60 rocket engines
- Space Shuttle frangible nuts & other parts
- SR - 71 specialty propulsion equipment
- Super collider cryogenic connectors
- Titan Missile fuel control system
- C - 5 Landing Gear Components
- Power Flow and Polarity Systems
- Solar array/deployment mechanism production support
We are mission ready
We understand that quality and performance matter
Atec is a proud provider of valves and engine components for RL10 & RS-25 Programs.
Manufacturing critical components on the upgraded RL10 and new production RS-25 engines.
Atec manufactures component parts to exact requirements with close tolerances, exotic materials and processes. Fuel & oxygen valves are assembled in our clean room and tested in our Cryogenic Flow Facility.